Experience
Solutions Live Here Consulting LLC – The Woodlands, TX - Jul 2024 to Present
President and Senior Consultant
Consulting Services for CAPEX Portfolio controls, annual budget strategies for accounting & controllers, track CAPEX spending/forecasting to support 5-year targets
C-Suite challenges, Strategic Planning, Team Building & Coaching, Risk Management, EHS, DOT, Fleet Transportation Planning & ESG,
Front End Acquisition due diligence support on operations & conditions for infrastructure, fleet & transportation, equipment with cost estimating for investment requirements
Creating plans for onboarding new companies
RelaDyne LLC – Cincinnati, OH - Jul 2022 to Jul 2024
Vice President CAPEX Portfolio, Facilities, Transportation & Safety
Direct RelaDyne’s overall Capital Expenditure Portfolio, Transportation strategy to invest $60M annually for facilities and a fleet of 2,000 semi-trucks, tankers and box trucks, DOT-EHS compliance & support for all Fleet, Facilities
Establish Planning, Manufacturing & Distribution Process design for distribution facilities Oversee strategy for modernization & apply new technologies for network optimization. Manage EHS Compliance in partnership with local, state, and federal regulators
Developed Benchmarking ESG Data for over 100 locations owned or operated by RelaDyne to establish strategic path forward ESG vision for reduction of greenhouse gases into 2035.
Created CAPEX Portfolio controls for annual budget & build SVPs strategy with accounting & controllers for all regions; track CAPEX spending/forecasting to support 5-year targets
Hired and managed a staff for EHS-Safety, Transportation DOT, Fleet Operations, Environmental, Risk Management Teams, to support 100 locations nationwide in 38 States
Director of EHS & Engineering - Feb 2021 - Jul 2022
Oversight for developing a new overall safety culture, promoting preventative risk observations & training to ensure accident-free environment. Defined, developed & hired nationwide EHS & DOT Teams to facilitate environmental, health & safety activities required by OSHA, EPA, DOT
Ensured regulatory adherence to provincial/state/federal rules for an operating company Administer health, safety & environmental reviews to remain in compliance with all laws
Implemented new safety program & reduced Total Recordable Incident Rates (TRIR) from 2.60 to 2.20 in one year (2021), Reduced Lost Time Incident Rates (LTIR) from 1.51 to .50 in one year (2021)
Executive Consulting – The Woodlands, TX - Sep 2019 to Feb 2021
EHS & Construction Management Consulting Services
Consulted for Houston Joint Venture; reviewed Board & Executive Leaders for EPC $200M Led negotiations of Ammonia Storage Tanks EPC, Topside Terminal, DOT Pipeline Assisted in hiring Engineering Manager & Construction Manager
Consulted for RelaDyne to determine process improvements and optimization for increased Productivity & Ergonomic of container packaging of lubricants, greases, oils Analyzed packaging to improve ergonomics; IBC, Drum, 5 Gallon Pails, 1 Gallon, Quarts Evaluated previous FEED team for re-directing AFE for budget revisions. Compiled cost estimate & technical feasibility report for Board for Budget Review & Approval
Univar Solutions LLC – The Woodlands, TX - Mar 2019 to Aug 2019
Director, Engineering & Capital Portfolio Management
Univar acquires Nexeo Solutions and becomes Univar Solutions in 2019. My duties were to assist Univar management with change management to create a new culture merging to create a successful transition. My duties were to direct Nexeo’s team with the overall Capital Expenditure Portfolio and transition over to Univar, all CAPEX, EHS compliance & support for all Fleet & Facilities.
Directed acquisition activities & transitioning 2 former companies with $50-100M budgets Created 5-year plan, strategic direction, capital project scope, design for chemical facilities Executed successful merger & awarded closure package, stock, & profit sharing Developed all corporate EHS & Corporate Engineering standards & SOP’s
Built global standards for ISO 9001 Best Practices for CAPEX Stage-Gate Controls Oversaw engineering & technical teams & services associated with Nexeo projects Directed CAPEX & Procurement for USA Regional Operations, Transportation, & HSE
Nexeo Solutions LLC – The Woodlands, TX - Jul 2012 to Aug 2019
Director, Engineering & Capital Portfolio Management
In July 2012, I joined a new Private Equity startup, Nexeo Solutions in 2012, after TPC acquired the company from Ashland Oil. My duties were to assist C-Suite management with change management to create a new engineering and EHS team and culture merging to create a successful transition for over 100 location and to centralize a new team to support Nexeo in The Woodlands, Texas new headquarters. My duties were to direct Nexeo’s team with the overall Capital Expenditure Portfolio all CAPEX, EHS compliance & support for all Fleet & Facilities. Supported Sustainability programs and ESG Programs.
Oversaw all staff to manage technical oversight & end-to-end $50M CAPEX projects, Created 5-year vision plan & overall direction of capital projects in chemical facilities Managed Engineering & Technical teams & services associated with projects
Led all CAPEX & Procurement for USA Regional Operations, Transportation, HSE, etc.
Conroe TX Facility Thermal Oxidizer: $8.5M Investment
Montgomery Facility, IL Plastic Packaging Facility: $10M Investment
Garland TX Facility, $10M Investment;
Houston TX Multi-Process Blending Facility: $5M Investment
Nationwide 30 Facilities, Safe Truck Loading & Automation Upgrades of 30 Facilities: $13.5M Investment
Univar (Formerly Van Waters & Rogers) | Redmond, WA
Director, Engineering & Capital Portfolio Management, - 1998 to Mar 2012
Directed planning & implementation CAPEX projects for NA/Europe chemical plants; managed $100M+ project budgets in 105 facilities Spearheaded 20+ members of global project teams to drive all design, procurement, engineering, programming & construction support Executed projects replacing infrastructure to support $500M growth over 10 years
Led planning sessions, process studies & facility construction; created project plans, mitigated risks & handled safety standards
Hired, trained, onboarded all engineering staff Collaborated with multiple business units & technology teams to define growth goals
Led $46M Los Angeles CA & $20M Morrisville PA CAPEX projects completed under budget & ahead of schedule
Providence RI Bleach Plant, Caustic Storage and Ammonia Plant Modernization: $20M Investment
1.2M Gallon 50% Caustic Storage Tank Farm, bleach plant and tank farm, New Aqua Ammonia Blending Plant
MAPCO Alaska Petroleum Inc | North Pole, AK
(In 1998, Williams Alaska Petroleum, Inc. (Williams) acquired MAPCO through a stock purchase, In 2003 Williams sells to Flint Hills)
Engineering Project Manager, - 1997 to Mar 1998
Oversaw Engineering Procurement Construction (EPC) for $100M crude unit project; added 80K BPD crude unit Increased crude oil production to 210K BPD, providing jet fuel to international air cargo market. Managed Engineering & Procurement team of 30 Engineers in Calgary Alberta; performed cost estimates, project development, project design, procurement of all equipment and logistics for shipping from lower USA to Alaska, Selected contractors, managed design, fabrication, construction. testing & facility launch into production.
Harris Group Inc | Seattle, WA -1991 to 1997
Project Engineering Manager Oil, Gas & Chemical Industry, - 1993 to 1997
Led all Project Managers to execute O&G/chemical projects, managed marketing, sales, proposals, negotiations & contractors
Petro Star Valdez Refinery | Valdez, Alaska: $45M Investment
MAPCO North Pole $100M - Naphtha Extraction Unit for premium gasoline production for the refinery; Depropanizer Unit increased depropanizer capacity; Crude Unit 2 Light Kerosene Stripper Increased kerosene capacity by installing larger stripper & re-boiler; VDU (Vapor Destruction Unit) design & install combustion flare system for rail cars & trucks to meet air quality regulations for VOC emissions Naphtha Turbine Fuel Product Storage/Truck Loading System | 5000 BPD supply of Turbine Fuel to Alyeska Pipeline pump stations Sulfolane Extraction Unit Overhead Condenser; Gasoline Truck Loading-Ethanol Blending
Project Engineering Manager - 1991 - 1993
Harris Group International Special Assignment | Irkutsk, Russia
Bratsky LPK, Bratsk, Russia Assignment, Supervised office, scoped projects, prepared capital cost estimates, budgets, planning, scheduling & transportation Compiled project staffing requirements, trained staff & led design teams in U.S. & Russia
Project Engineer for 2700 dst/d (Dry Solid Tons per day) Black Liquor Recovery Boiler: $100M cost Project scope included detail design, supply, installation, & commissioning of recovery boiler island included following major items; Conservatively designed single drum 2700 dst/d Babcock & Wilcox recovery boiler Black liquor concentrator system consisting of falling film evaporators & crystallizers 2 66% flow electric-static precipitators & 140 m stack, 34 MW turbine generator (400 t/hr @ 85 bar steam extracted to 120 t/hr @ 40 bars), 11 kV, 6.3 kV, 380 V electrical systems, integrated distribution control system, building & civil